Renovations, Repairs & Upgrades, James Building
  • Renovations, Repairs & Upgrades, James Building

Renovations, Repairs & Upgrades, James Building, Pensacola, FL

Details

  • Completed 2003
  • The Project was a floor by floor demolition and replacement of air and electrical distribution and lighting systems of the 7 story fully occupied office building. Significant challenges included relocating state tenants departments’ staff, equipment, furniture, & communications within the building with no longer than a one week down time.
  • As a result of phasing studies, relocation plans, tenant conferences and aggressive scheduling the project was brought in significantly under budget and ahead of schedule.

Hurricane Ivan Emergency Response, Repairs & Reconstruction

EMERGENCY RESPONSE 2004

  • Water removal, drying & clean-up; 48 hours.
  • Temporary roof covering & rainfall run-off systems.
  • Removal of debris & temp. plywood enclosures.
  • Heavy timber bracing of Penthouse CMU wall
  • Electrical & Mechanical inspection, troubleshooting, repairs.
  • Shoring, removal & replacement of Penthouse CMU walls
  • Assistance to Engineer’s inspections.
  • Building fully re-occupied within 7 days.

PENTHOUSE REPAIRS & RECONSTRUCTION 2005

  • Demolished CMU wall & reconstructed LT Ga / EIFS wall.
  • Installed new Fresh Air Louvers & Duct.
  • HVAC equipment and controls replacement & repairs
  • Electrical panels, motors starters, distribution and controls

CURTAIN WALL INVESTIGATION, STABILIZATION, GLAZING 2006/08

  • Two phases cutting anchor investigation portals
  • Relocated tenants and made structural repairs to all structural anchors on all floors.
  • Repaired finishes GWB, wall base, and painted.
  • Replaced failed glazing units and wetsealed all units.